FRANKLIN COUNTY, Ind.— The closure of U.S. 52 west of Brookville in Franklin County has been rescheduled to begin on or after Monday, March 30, for crews to start work on a slide repair project. INDOT contractor GeoStabilization International will stabilize approximately 900 feet of roadway and shoulder with a shotcrete soil nail wall.

The road will close about one-half mile west of S.R. 101 in Franklin County through mid-to-late June. The detour route for U.S. 52 EB will follow I-74 to S.R. 229, and S.R. 1 to S.R. 44 for U.S. 52 WB.

Motorists should slow down, use extra caution and drive distraction-free in and near all work zones. All work is weather dependent.